Prompt Photo Reports on the Progress of the Archeological Excavation. by villa_somma
Aug 23, 2012
Aug 22, 2012
A cooking stove
Preparations to re-examine of a very simple cooking stove of the late fifth century, which was discovered in Room No.2 (Vano 2) in 2005
Aug 21, 2012
Aug 20, 2012
Stone pavement
Cleaning work to re-examine the stone pavement, which was revealed in the south end of the excavation in 2004.
Labels:
architecture
Resumption of the excavation
After three weeks intermission of works we resumed the excavation.
Now we have to continue removing the volcanic materials carried and accumulated by some flows until the red line level shown on the photo below.
As usual, these volcanic materials are very stiff.
Now we have to continue removing the volcanic materials carried and accumulated by some flows until the red line level shown on the photo below.
As usual, these volcanic materials are very stiff.
Labels:
general
Aug 18, 2012
Excavation area in 2012
We started the excavation on 16 July in this year.
![]() |
Currently, we remove the remains of volcanic materials of the eruption in 472 AD.
|
Labels:
general