Excavations in Somma Vesuviana (NA), ITALY

Prompt Photo Reports on the Progress of the Archeological Excavation. by villa_somma

Aug 29, 2011

Reinforcement work around the doorway

To prevent the collapse of the wall, we inserted an wooden beam along the upper edge of the doorway.



 (Before the reinforcement works)
 (After them)
Posted by villa_somma at 11:18 PM
Email ThisBlogThis!Share to TwitterShare to FacebookShare to Pinterest
Labels: architecture, restoration-conservation
Newer Post Older Post Home

*** Categories ***

  • architecture
  • documentating
  • environment
  • fellows
  • general
  • materials
  • occasion
  • other topics
  • restoration-conservation

*** Archives ***

  • ►  2014 (30)
    • ►  October (1)
    • ►  September (18)
    • ►  August (11)
  • ►  2013 (1)
    • ►  August (1)
  • ►  2012 (16)
    • ►  September (3)
    • ►  August (13)
  • ▼  2011 (52)
    • ►  October (4)
    • ►  September (27)
    • ▼  August (21)
      • Mercato Vecchio Station
      • Reinforcement work around the doorway
      • Cleaning the ground surface
      • Bottom of the cistern
      • Making precise survey drawings
      • Our Fellows
      • Our Fellows
      • Say cheese!!
      • Today's our patch
      • In front of the doorway
      • Our Fellows
      • Reinforcement of a wall
      • Mt. Vesuvius
      • Digressing from the subject
      • Before a 2 week's holiday
      • Removal of volcanic materials
      • Eaves with roofing tiles around the dome
      • Decoration with stucco reliefs
      • In addition to the fragment of an arch
      • Another wall was found.
      • Some new aspects during the excavation

*** Link LIst ***

  • Other Articles on The Excavation Before 2009
  • ROMUALDO DEL BIANCO FOUNDATION - Florence, ITALY
  • Life Beyond Tourism
  • Worldsite Hotels
Watermark theme. Powered by Blogger.