Excavations in Somma Vesuviana (NA), ITALY

Prompt Photo Reports on the Progress of the Archeological Excavation. by villa_somma

Sep 6, 2011

The cistern

We finished the excavation in the cistern.
We could revealed only a part of the west wall of it. So the dimensions of it are unknown yet.




On the bottom of the cistern we found that the floor was renovated at least once.


Posted by villa_somma at 11:19 AM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: architecture
Newer Post Older Post Home

*** Categories ***

  • architecture
  • documentating
  • environment
  • fellows
  • general
  • materials
  • occasion
  • other topics
  • restoration-conservation

*** Archives ***

  • ►  2014 (30)
    • ►  October (1)
    • ►  September (18)
    • ►  August (11)
  • ►  2013 (1)
    • ►  August (1)
  • ►  2012 (16)
    • ►  September (3)
    • ►  August (13)
  • ▼  2011 (52)
    • ►  October (4)
    • ▼  September (27)
      • Open Site Days
      • The tunnel
      • La Festa Finale
      • General views of the excavation
      • Our fellows
      • Cleaning
      • Today's our patch
      • It rained after an interval of two months
      • Congratulations, Antonio !
      • In the tunnel
      • Buon viaggio!
      • Today's our patch
      • What's this ? (2)
      • Our Fellows
      • Farewell lunch
      • Protecting the pavement of the cistern
      • The excavation continues
      • What's this ?
      • Our Fellows
      • The cistern
      • Our Fellows
      • Some aligned huge pots
      • Disruption of train services in this area
      • Today's our patch
      • Our Fellows
      • Loading and carrying out of the excavated soil
      • Cleaning of the ground surface
    • ►  August (21)

*** Link LIst ***

  • Other Articles on The Excavation Before 2009
  • ROMUALDO DEL BIANCO FOUNDATION - Florence, ITALY
  • Life Beyond Tourism
  • Worldsite Hotels
Watermark theme. Powered by Blogger.